Salads To Go
Pipe Work Fabrication & On-site Installation
Installation of new UPVC salad wash spray system
Salads To Go required a new spray system in order to wash down salad before it leaves the line for packaging. We installed a new GRP tank including the fabrication and installation of a galvanised steel frame for the tank to be mounted on to. We also installed new Grundfos pumps and a heat exchanger that where required in order to circulate the water at the right temperature. We ran a flow and return line 40m long in 2” solvent welded UPVC pipe work including brackets, which fed into 304 stainless steel spray bars. We designed, manufactured and installed 304 stainless steel drip trays under conveyor belt in order to catch the water after it has sprayed the salad and fed back to the tank.